Skip to content

Structural · Case study

Blackbutt Entertainer

Location
Kellyville, NSW
Year
2024
Duration
4 weeks
Category
Structural
Blackbutt Entertainer
Scope

62 m² hardwood deck, hidden fixings, dead-level finish over a 240mm fall.

The hard part

Why this needed an engineer.

Existing yard fell 240mm across the deck footprint. The client wanted level, no step, no visible step-down, but a level deck over sloping ground means understanding ventilation, drainage and bearer span all at once.

How we solved it

The engineering thinking.

Built a hybrid pier-and-beam frame that lifts the high side just enough to clear minimum sub-floor ventilation, with bearers up-sized at the long span. Hidden fasteners ride in a milled groove so the board face is clean; the fixings hold the boards into the joists, not just to them.

Materials
  • Blackbutt (Eucalyptus pilularis)
  • Galvanised joists
  • Stainless hidden clips
Outcome

A 62 m² deck that reads flat and quiet under foot. No squeaks, no cup, two summers in.

Commission

Build something like this.

Tell us the brief, we'll reply with a thoughtful response within one business day.

Start a quote
Zargari · loading
000000100